Illustrative ADU exterior

Long Beach ADU Projects

ADU Construction in Long Beach, CA

Explore a backyard home, garage conversion, or space for family.

Start With Your Property

The right ADU depends on your lot, existing buildings, and how you want to use the space. Compare the options, then discuss access, utilities, plans, and permits before committing to construction.

ADU Services

Detached ADU Construction

A separate home with its own entrance, kitchen, and bathroom.

Learn more →

Garage-to-ADU Conversions

Adapt an existing garage for residential use.

Learn more →

Attached ADU Construction

An independent living area connected to the main house.

Learn more →

ADU Design And Build

Coordinate the layout, building systems, and construction scope.

Learn more →

ADU Plans And Permits

Understand the drawings, reviews, and approvals your project needs.

Learn more →

ADU Remodeling And Renovations

Update an existing unit’s layout, kitchen, bathroom, or finishes.

Learn more →

Plan Before You Build

Decide who the unit is for, what rooms it needs, and how it will connect to the main property.

Before agreeing to work, confirm who will provide it, review their credentials, and get the scope and price in writing.

About This Website
Illustrative backyard ADU exterior with wood siding
Illustrative image, not a completed customer project.

Common ADU Questions

Can I build an ADU on my Long Beach property?

Many residential properties may qualify for an ADU under California law and applicable local regulations. Eligibility and the type of unit allowed depend on the property and proposed project. A site-specific review is the best starting point.

Can I convert my garage into an ADU?

Garage conversions are a common option for homeowners with existing detached or attached garages. The structure must be evaluated for residential use, including applicable safety, utility, and building requirements. Some garages need substantial improvements.

Do I need permits to build an ADU in Long Beach?

ADU construction generally requires permits and applicable approvals. The exact review process depends on the proposed work and the authority responsible for the property. Plans should be prepared to meet current requirements.

How long does ADU construction take?

The schedule depends on the design, site conditions, permit review, construction scope, inspections, and material availability. A garage conversion and a new detached ADU can involve very different timelines. Discuss scheduling after the scope is defined.

Discuss Your ADU Project

Tell us about your property and the space you want to create.